Electricity supply to the Federal Capital Territory and neighbouring states received a boost with the commissioning of the Gwagwalada 330/132/33kV substation, delivered under the National Integrated Power Project (NIPP) and managed by the Niger Delta Power Holding Company (NDPHC).
The commissioning ceremony was attended by the then Vice President, Arc. Namadi Sambo, and the then Minister of Power, Prof. Chinedu Nebo.
Cartlark’s role at Ajaokuta
Power for the new Gwagwalada substation is supplied from the Ajaokuta 330/132/33kV substation in Kogi State. Under NIPP Lot 22-1A(T), Cartlark International constructed the originating bay extension works and the controlling switchgear at Ajaokuta, with ElensKonsult as consultant.
According to NDPHC, the Ajaokuta bay works were completed and energised together with the Gwagwalada substation on 22 December 2012. The 330kV lines linking the two stations, totalling 252.6 km, were built by another contractor under a separate NIPP lot.
Key facts
- Programme: National Integrated Power Project (NIPP), NDPHC
- Cartlark scope: originating bay extension and controlling switchgear at Ajaokuta 330/132/33kV substation (Lot 22-1A(T))
- Energised: 22 December 2012
- Gwagwalada substation: 2 × 150MVA 330/132kV transformers
Need substation or transmission works delivered? Contact Cartlark.
Sources: Blueprint, “Electricity supplies to FCT, adjoining states receive boost”.